SpECcoat PE145

SOLVENT BASED PITCH EXTENDED EPOXY RESIN COATING

SpECcoat PE145 is a two part, solvent based,
epoxy resin coating system modified with specially
refined coal tar pitch. The coating once cured
provides a semiflexible waterproof corrosion
resistant coating with excellent adhesion to a wide
variety of substrates and good chemical resistance.

Product Videos

Technical Details

To provide economic protection to concrete and metal structures in aggressive environments: Particularly useful and economic in dirty water situations such as:
. Sewage plants
. Effluent plants
. Docks
. Harbour installations
. Good abrasion resistance and waterproofing properties
. Resistant to a wide range of chemicals (see Chemical Resistance chart)
. Provides long term protection
. No primer required for sound concrete substrate (consult our Technical Department)
. Economic and versatile

Volume solids 

72% 

Pot life 

4 hours @ 20°C 

Overcoating time 

16 24 hours @ 20°C 
Full cure 

7 days @ 20°C 

Service temperature Dry 

30°C to +65°C 
Adhesion strength 

≥2.5 MPa 

thickness 

145 µm (min. 2 coats) 

Preparation
It is essential that adequate preparation is carried out prior to the application of SpECcoat PE145. For concrete and steel surfaces, grit blasting is recommended. Steel surfaces should be prepared to bright metal Standard. The preparation should ensure the removal of old coatings, laitance, grease and oil.

Any imperfections or ‘blow holes’ should be filled using SpECcoat BC.

Mixing
SpECcoat PE145 is supplied in a two-component kit consisting of a base component and a curing agent.

The contents of the base can should be stirred thoroughly to disperse any settlement. The entire contents of the hardener can should then be added to the base container and mixed thoroughly until a uniform colour and consistency are obtained, taking particular care to scrape the sides and bottom of the container. It is recommended that mechanical mixing be employed using a Jiffy mixer on a heavy duty, slow speed electric drill.

Application
SpECcoat PE145 may be applied by brush, roller or airless spray. The application should produce an even coverage without pinholes.
The first coat should be worked well into the surface. The top coat should then be applied within 24 hours. Any condensation that has formed on the first coat should be wiped off before applying the second coat.
SpECcoat PE145 is supplied in the pack sizes given below with the following recommended coverage rates:

SpECcoat PE145
4.5 litres and 15 litres
@200µm wft: 5.0 m²/litre applied in 2 coats
Contact us for more info.

Product FAQ

Bardawil Ai

Ask it Anything!

Related Products

Get a call back

Need help? The Bardawil team's got you! Send us a message with your question, and we'll quickly be in touch.

Documents

Download TDS

Need Help?

+974 5533 5711

Send Us

WhatsApp Message

Industrial Area, Stress 42, Gate B3.

Barwa Commercial Avenue, Safwa Block Building 2, 2nd Floor

SpECcoat PE145

Submittal Request

Or, Get a Call Back